Schedule 1 - Monthly Service

 

  • Perform all monthly preventive maintenance (PM) required by the manufacturer’s specifications and make detailed inspections to locate and repair any weakened parts
  • Check operator logs for equipment performance, problems, etc.
  • Check for and repair any leaks
  • Check valves for proper operation-repair if necessary
  • Check pressure across all filter and replace filters as necessary
  • Check all tank level controls for proper heights and accuracy
  • Check carbon filter for pH, inlet/outlet pressure and chlorine breakthrough
  • Check water softener regeneration
  • Fill tanks and reservoirs
  • Check pumps for proper operation
  • Check DI for water resistivity, leaks, pressures and proper functioning
  • Check RO for all pressures, permeate and rejection flow rates, permeate resistivity, recovery rate and temperature
  • Check system as one complete system in addition to its various components
  • Complete and subsequently mail a service maintenance data log sheet along with a letter detailing any observed variations, deviations or problems